PROJECT PORTFOLIO

REFER TO COMPANY PROFILE FOR DETAILED PROJECT LIST

BMR Migration of Purification Circuit

SCOPE:

DESCRIPTION:

YEAR:

ECI

Fabricate and Install cable racks, install ECI cables, migrate all motors and valves from old system. Commissioning and debottlenecking of ECI system

2016

Sulphuric Acid Make Up Tank

SCOPE:

DESCRIPTION:

YEAR:

SMPP

Fabrication & Install walkways. Installation of tank, pumps and fabricate
& Install piping

2017

Screen Replacement Project (SIMS)

SCOPE:

DESCRIPTION:

YEAR:

Civils, SMPP, E&I

Fabrication and install structures, install ECI cables, install free issued screens, Commissioning and handover the system

2018

Silo B Structure Replacement Project (SIMS)

SCOPE:

DESCRIPTION:

YEAR:

Civils, SMPP, E&I

Fabrication and install structures, install ECI cables, install free issued chutes, modify conveyor belts, commissioning and handover the system

2019

Roof Sump Floor Replacement

SCOPE:

DESCRIPTION:

YEAR:

Civils, SMPP, E&I

Fabrication and install structures, install ECI cables, install free issued roof sumps, commissioning and handover the system

2019

Filter No. 5 Project Conveyor

SCOPE:

DESCRIPTION:

YEAR:

SMPP, E&I

Replacement of filter press system, commission and handover (SIMS)

2019

Grootegeluk GG1 Chute / Steel Replacement Project

SCOPE:

DESCRIPTION:

YEAR:

Civils, SMPP, E&I

Replacement of Mill Plant structure (SIMS)

2019

Grootegeluk Reductant Plant Rebuild Steelwork Repair

SCOPE:

DESCRIPTION:

YEAR:

Civils, SMPP, E&I

Refurbishment of the previously burnt reductant Plant (SIMS)

2019

Brine Concentrator

SCOPE:

DESCRIPTION:

YEAR:

SMPP, E&I

Replacement of old brine concentrator and piping

2020

Stores roof insulation
SCOPE:

DESCRIPTION:

YEAR:

Structural, Sheeting

Replacement of the store
roof insulation

2020

Tripper Car Replacement

SCOPE:

DESCRIPTION:

YEAR:

Structural, Platework

Design, fabrication, installation of tripper car

2020

Concrete Repairs
SCOPE:

DESCRIPTION:

YEAR:

Civil

Repair of columns

2020

351 MCC Replacement (TURNKEY)

SCOPE:

DESCRIPTION:

YEAR:

Civil, Electrical

Removal and installation of MCC’s

2020

Cobalt condenser

SCOPE:

DESCRIPTION:

YEAR:

SMPP

Maintenance of cobalt condenser

2020

Firewater tie-ins
SCOPE:

DESCRIPTION:

YEAR:

Piping

Piping tie-ins

2020

Diesel Central Workshop Refurbishment

SCOPE:

DESCRIPTION:

YEAR:

Civils, Structural, Sheeting

Refurbishment of Diesel Central Workshop

2020

SIMS Steel
SCOPE:

DESCRIPTION:

YEAR:

Structural

Maintenance of steel structures

2020

Ni Polishing Project
SCOPE:

DESCRIPTION:

YEAR:

Mechanical

Installation of piping and tanks

2017

GG Plant Shut
SCOPE:

DESCRIPTION:

YEAR:

Structural

Plant shut maintenance

2020

Stormwater Project
SCOPE:

DESCRIPTION:

YEAR:

Civils

RBMR Stormwater Upgrade

2020

Steel & Concrete Rehabilitation

SCOPE:

DESCRIPTION:

YEAR:

Structure, Civils

Rehabilitation of Steel and Concrete Structures in the Smelter

2021

Matla mine gates

SCOPE:

DESCRIPTION:

YEAR:

Structure, Civils

Design Fabrication Erection of Mine Gates

2019

Oversize Protection Screen

SCOPE:

DESCRIPTION:

YEAR:

Structural Steel 

Installation of the oversize protection screen

2021

Compressor MCC

SCOPE:

DESCRIPTION:

YEAR:

Building Works

Construction of new MCC building

2021

North West Mine 3 Infrastructure

SCOPE:

DESCRIPTION:

YEAR:

CSMPPEC&I

Completion & commissioning of the incline and decline conveyor to support the development of Mine 3

2022

E&S Concrete Rehad P1

SCOPE:

DESCRIPTION:

YEAR:

Civil

E&S Filter Plant Concrete Rehabilitation & Installation of Stainless Steel Liners

2022

Sodium Sulfate Hopper Transporter

SCOPE:

DESCRIPTION:

YEAR:

Mechanical, Structural

Installation of Structural Steel & Equipment on Sodium Sulphare Silo

2022

E&S Concrete Rehad P2 & P3

SCOPE:

DESCRIPTION:

YEAR:

Civil

E&S Filter Plant Concrete Rehabilitation. Acid Proofing & Acid Brick Installation

2022

BMR Migration of Purification Circuit

SCOPE:
ECI

DESCRIPTION:
Fabricate and Install cable racks, install ECI cables, migrate all motors and valves from old system. Commissioning and debottlenecking of ECI system

YEAR:
2016

Sulphuric Acid Make Up Tank

SCOPE:
SMPP

DESCRIPTION:
Fabrication & Install walkways. Installation of tank, pumps and fabricate
& Install piping

YEAR:
2017

Screen Replacement Project (SIMS)

SCOPE:
Civils SMPP E&I

DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued screens, Commissioning and handover the system

YEAR:
2018

Silo B Structure Replacement Project (SIMS)

SCOPE:
Civils, SMPP, E&I

DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued chutes, modify conveyor belts, commissioning and handover the system

YEAR:
2019

Roof Sump Floor Replacement

SCOPE:
Civils SMPP E&I

DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued roof sumps, commissioning and handover the system

YEAR:
2019

Filter No. 5 Project Conveyor

SCOPE:
SMPP E&I

DESCRIPTION:
Replacement of filter press system, commission and handover (SIMS)

YEAR:
2019

Grootegeluk GG1 Chute / Steel Replacement Project

SCOPE:
Civils SMPP E&I

DESCRIPTION:
Replacement of Mill Plant structure (SIMS)

YEAR:
2019

Grootegeluk Reductant Plant Rebuild Steelwork Repair

SCOPE:
Civils SMPP E&I

DESCRIPTION:
Refurbishment of the previously burnt reductant Plant (SIMS)

YEAR:
2019

Brine Concentrator

SCOPE:
SMPP E&I

DESCRIPTION:
Replacement of old brine concentrator and piping

YEAR:
2020

Stores roof insulation

 

SCOPE:
Structural, Sheeting

DESCRIPTION:
Replacement of the store roof insulation

YEAR:
2020

Tripper Car Replacement

SCOPE:
Structural, Platework

DESCRIPTION:
Design, fabrication, installation of tripper car

YEAR:
2020

Concrete Repairs

SCOPE:
Civil

DESCRIPTION:
Repair of columns

YEAR:
2020

351 MCC Replacement (TURNKEY)

SCOPE:
Civil Electrical

DESCRIPTION:
Removal and installation of MCC’s

YEAR:
2020

Cobalt condenser


SCOPE:
SMPP

DESCRIPTION:
Maintenance of cobalt condenser

YEAR:
2020

Firewater tie-ins

SCOPE:
Piping

DESCRIPTION:
Piping tie-ins

YEAR:
2020

Diesel Central Workshop Refurbishment

 

SCOPE:
Civils Structural Sheeting

DESCRIPTION:
Refurbishment of Diesel Central Workshop

YEAR:
2020

SIMS Steel

SCOPE:
Structural

DESCRIPTION:
Maintenance of steel structures

YEAR:
2020

Ni Polishing Project

SCOPE:
Mechanical

DESCRIPTION:
Installation of piping and tanks

YEAR:
2017

GG Plant Shut

SCOPE:
Structural

DESCRIPTION:
Plant shut maintenance

YEAR:
2020

Stormwater Project

SCOPE:
Civils

DESCRIPTION:
RBMR Stormwater Upgrade

YEAR:
2020

Steel & Concrete Rehabilitation

SCOPE:
Structure & Civils

DESCRIPTION:
Rehabilitation of Steel and Concrete Structures in the Smelter

YEAR:
2021

Matla mine gates

SCOPE:
Structure & Civils

DESCRIPTION:
Design Fabrication Erection of Mine Gates

YEAR:
2019

OVERSIZE PROTECTION SCREEN

SCOPE:
Structural Steel 

DESCRIPTION:
Installation of the oversize protection screen

YEAR:
2021

COMPRESSOR MCC

SCOPE:
Building Works

DESCRIPTION:
Construction of new MCC building

YEAR:
2021

NORTH WEST MINE 3 INFRASTRUCTURE

 

SCOPE:
CSMPPEC&I

DESCRIPTION:
Completion & commissioning of the incline and decline conveyor to support the development of Mine 3

YEAR:
2022

E&S Concrete Rehad P1

 

SCOPE:
Civil

DESCRIPTION:
E&S Filter Plant Concrete Rehabilitation & Installation of Stainless Steel Liners

YEAR:
2022

Sodium Sulfate Hopper Transporter

 

SCOPE:
Mechanical, Structural

DESCRIPTION:
Installation of Structural Steel & Equipment on Sodium Sulphare Silo

YEAR:
2022

E&S Concrete Rehad P2 & P3

 

SCOPE:
Civil

DESCRIPTION:
E&S Filter Plant Concrete Rehabilitation. Acid Proofing & Acid Brick Installation

YEAR:
2022