BMR Migration of Purification Circuit
SCOPE: DESCRIPTION:
YEAR: |
ECI Fabricate and Install cable racks, install ECI cables, migrate all motors and valves from old system. Commissioning and debottlenecking of ECI system 2016 |
Sulphuric Acid Make Up Tank
SCOPE: DESCRIPTION:
YEAR: |
SMPP Fabrication & Install walkways. Installation of tank, pumps and fabricate 2017 |
Screen Replacement Project (SIMS)
SCOPE: DESCRIPTION:
YEAR: |
Civils, SMPP, E&I Fabrication and install structures, install ECI cables, install free issued screens, Commissioning and handover the system 2018 |
Silo B Structure Replacement Project (SIMS)
SCOPE: DESCRIPTION:
YEAR: |
Civils, SMPP, E&I Fabrication and install structures, install ECI cables, install free issued chutes, modify conveyor belts, commissioning and handover the system 2019 |
Roof Sump Floor Replacement
SCOPE: DESCRIPTION:
YEAR: |
Civils, SMPP, E&I Fabrication and install structures, install ECI cables, install free issued roof sumps, commissioning and handover the system 2019 |
Filter No. 5 Project Conveyor
SCOPE: DESCRIPTION: YEAR: |
SMPP, E&I Replacement of filter press system, commission and handover (SIMS) 2019 |
Grootegeluk GG1 Chute / Steel Replacement Project
SCOPE: DESCRIPTION: YEAR: |
Civils, SMPP, E&I Replacement of Mill Plant structure (SIMS) 2019 |
Grootegeluk Reductant Plant Rebuild Steelwork Repair
SCOPE: DESCRIPTION: YEAR: |
Civils, SMPP, E&I Refurbishment of the previously burnt reductant Plant (SIMS) 2019 |
Brine Concentrator
SCOPE: DESCRIPTION: YEAR: |
SMPP, E&I Replacement of old brine concentrator and piping 2020 |
Stores roof insulation
SCOPE:
DESCRIPTION:
YEAR: |
Structural, Sheeting
Replacement of the store 2020 |
Tripper Car Replacement
SCOPE: DESCRIPTION: YEAR: |
Structural, Platework Design, fabrication, installation of tripper car 2020 |
Concrete Repairs
SCOPE:
DESCRIPTION: YEAR: |
Civil
Repair of columns 2020 |
351 MCC Replacement (TURNKEY)
SCOPE: DESCRIPTION: YEAR: |
Civil, Electrical Removal and installation of MCC’s 2020 |
Cobalt condenser
SCOPE: DESCRIPTION: YEAR: |
SMPP Maintenance of cobalt condenser 2020 |
Firewater tie-ins
SCOPE:
DESCRIPTION: YEAR: |
Piping
Piping tie-ins 2020 |
Diesel Central Workshop Refurbishment
SCOPE: DESCRIPTION: YEAR: |
Civils, Structural, Sheeting Refurbishment of Diesel Central Workshop 2020 |
SIMS Steel
SCOPE:
DESCRIPTION: YEAR: |
Structural
Maintenance of steel structures 2020 |
Ni Polishing Project
SCOPE:
DESCRIPTION:
YEAR: |
Mechanical
Installation of piping and tanks 2017 |
GG Plant Shut
SCOPE:
DESCRIPTION: YEAR: |
Structural
Plant shut maintenance 2020 |
Stormwater Project
SCOPE:
DESCRIPTION: YEAR: |
Civils
RBMR Stormwater Upgrade 2020 |
Steel & Concrete Rehabilitation
SCOPE: DESCRIPTION: YEAR: |
Structure, Civils Rehabilitation of Steel and Concrete Structures in the Smelter 2021 |
Matla mine gates
SCOPE: DESCRIPTION: YEAR: |
Structure, Civils Design Fabrication Erection of Mine Gates 2019 |
Oversize Protection Screen
SCOPE: DESCRIPTION: YEAR: |
Structural Steel Installation of the oversize protection screen 2021 |
Compressor MCC
SCOPE: DESCRIPTION: YEAR: |
Building Works Construction of new MCC building 2021 |
North West Mine 3 Infrastructure
SCOPE: DESCRIPTION: YEAR: |
CSMPPEC&I Completion & commissioning of the incline and decline conveyor to support the development of Mine 3 2022 |
E&S Concrete Rehad P1
SCOPE: DESCRIPTION: YEAR: |
Civil E&S Filter Plant Concrete Rehabilitation & Installation of Stainless Steel Liners 2022 |
Sodium Sulfate Hopper Transporter
SCOPE: DESCRIPTION: YEAR: |
Mechanical, Structural Installation of Structural Steel & Equipment on Sodium Sulphare Silo 2022 |
E&S Concrete Rehad P2 & P3
SCOPE: DESCRIPTION: YEAR: |
Civil E&S Filter Plant Concrete Rehabilitation. Acid Proofing & Acid Brick Installation 2022 |
BMR Migration of Purification Circuit
SCOPE:
ECI
DESCRIPTION:
Fabricate and Install cable racks, install ECI cables, migrate all motors and valves from old system. Commissioning and debottlenecking of ECI system
YEAR:
2016
Sulphuric Acid Make Up Tank
SCOPE:
SMPP
DESCRIPTION:
Fabrication & Install walkways. Installation of tank, pumps and fabricate
& Install piping
YEAR:
2017
Screen Replacement Project (SIMS)
SCOPE:
Civils SMPP E&I
DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued screens, Commissioning and handover the system
YEAR:
2018
Silo B Structure Replacement Project (SIMS)
SCOPE:
Civils, SMPP, E&I
DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued chutes, modify conveyor belts, commissioning and handover the system
YEAR:
2019
Roof Sump Floor Replacement
SCOPE:
Civils SMPP E&I
DESCRIPTION:
Fabrication and install structures, install ECI cables, install free issued roof sumps, commissioning and handover the system
YEAR:
2019
Filter No. 5 Project Conveyor
SCOPE:
SMPP E&I
DESCRIPTION:
Replacement of filter press system, commission and handover (SIMS)
YEAR:
2019
Grootegeluk GG1 Chute / Steel Replacement Project
SCOPE:
Civils SMPP E&I
DESCRIPTION:
Replacement of Mill Plant structure (SIMS)
YEAR:
2019
Grootegeluk Reductant Plant Rebuild Steelwork Repair
SCOPE:
Civils SMPP E&I
DESCRIPTION:
Refurbishment of the previously burnt reductant Plant (SIMS)
YEAR:
2019
Brine Concentrator
SCOPE:
SMPP E&I
DESCRIPTION:
Replacement of old brine concentrator and piping
YEAR:
2020
Stores roof insulation
SCOPE:
Structural, Sheeting
DESCRIPTION:
Replacement of the store roof insulation
YEAR:
2020
Tripper Car Replacement
SCOPE:
Structural, Platework
DESCRIPTION:
Design, fabrication, installation of tripper car
YEAR:
2020
Concrete Repairs
SCOPE:
Civil
DESCRIPTION:
Repair of columns
YEAR:
2020
351 MCC Replacement (TURNKEY)
SCOPE:
Civil Electrical
DESCRIPTION:
Removal and installation of MCC’s
YEAR:
2020
Cobalt condenser
SCOPE:
SMPP
DESCRIPTION:
Maintenance of cobalt condenser
YEAR:
2020
Firewater tie-ins
SCOPE:
Piping
DESCRIPTION:
Piping tie-ins
YEAR:
2020
Diesel Central Workshop Refurbishment
SCOPE:
Civils Structural Sheeting
DESCRIPTION:
Refurbishment of Diesel Central Workshop
YEAR:
2020
SIMS Steel
SCOPE:
Structural
DESCRIPTION:
Maintenance of steel structures
YEAR:
2020
Ni Polishing Project
SCOPE:
Mechanical
DESCRIPTION:
Installation of piping and tanks
YEAR:
2017
GG Plant Shut
SCOPE:
Structural
DESCRIPTION:
Plant shut maintenance
YEAR:
2020
Stormwater Project
SCOPE:
Civils
DESCRIPTION:
RBMR Stormwater Upgrade
YEAR:
2020
Steel & Concrete Rehabilitation
SCOPE:
Structure & Civils
DESCRIPTION:
Rehabilitation of Steel and Concrete Structures in the Smelter
YEAR:
2021
Matla mine gates
SCOPE:
Structure & Civils
DESCRIPTION:
Design Fabrication Erection of Mine Gates
YEAR:
2019
OVERSIZE PROTECTION SCREEN
SCOPE:
Structural Steel
DESCRIPTION:
Installation of the oversize protection screen
YEAR:
2021
COMPRESSOR MCC
SCOPE:
Building Works
DESCRIPTION:
Construction of new MCC building
YEAR:
2021
NORTH WEST MINE 3 INFRASTRUCTURE
SCOPE:
CSMPPEC&I
DESCRIPTION:
Completion & commissioning of the incline and decline conveyor to support the development of Mine 3
YEAR:
2022
E&S Concrete Rehad P1
SCOPE:
Civil
DESCRIPTION:
E&S Filter Plant Concrete Rehabilitation & Installation of Stainless Steel Liners
YEAR:
2022
Sodium Sulfate Hopper Transporter
SCOPE:
Mechanical, Structural
DESCRIPTION:
Installation of Structural Steel & Equipment on Sodium Sulphare Silo
YEAR:
2022
E&S Concrete Rehad P2 & P3
SCOPE:
Civil
DESCRIPTION:
E&S Filter Plant Concrete Rehabilitation. Acid Proofing & Acid Brick Installation
YEAR:
2022